Reference file

Lanes

lanes.md

The lanes and their data contracts

A lane is one horizontal strip on the command center: one area of your work, mirrored from one system of record. This page lists the lanes a cross-function GTM operator usually needs, what each shows, and the minimum data contract that keeps the lane cheap to build and hard to break.

The rule for adding a lane

A lane earns its place only if you take action in it. If you only watch it, it is a report, not a lane, and it belongs in a weekly review, not on your daily surface. When in doubt, leave it off; an empty-feeling command center you trust beats a full one you skim.

The common lanes

Lane What it shows System of record You act by
Task board Your open deliverables, owner-labelled, with a done state Your project/task tool Marking done, reprioritising
Outreach queue Drafts and sends awaiting your review or follow-up Your outreach/sequence tool or drafts folder Approving, editing, sending by hand
Content / publishing queue Posts, articles, or assets waiting on you to draft, approve, or schedule Your content calendar or draft store Approving, scheduling
Research digest The latest signal on your beat - competitor moves, news, mentions Your research feed or saved searches Deciding what to act on
Events / presence Upcoming events, who is going, what is committed vs a candidate Your calendar and events tracker Deciding attendance, prep
Pipeline snapshot The few deals or opportunities that need you now Your CRM One next action per item

Pick the four to six that match your role. A content-and-comms operator leans on the outreach, content, research, and events lanes; a seller leans on pipeline, tasks, and outreach. Do not ship all six by default.

The data contract per lane

Keep each lane's contract to the smallest set of fields that lets you act without opening the source tool. A workable default per item:

  • a title that is legible on its own,
  • a stable id so the item can be toggled or annotated without duplicating,
  • a state (for example: waiting on you, in progress, done),
  • an owner or lane label so a shared view can be built cleanly later,
  • a link back to the system of record for anything heavier than a glance,
  • optionally a why-now note or a small score, kept behind the item, not shown as a wall of numbers.

The contract is the boundary between the lane and its source tool. If you find yourself wanting a seventh and eighth field, you are rebuilding the source tool inside the lane - stop, and link out instead.

Candidate events vs commitments

One subtlety that trips people up: a lane that lists candidate events (things happening that quarter you could attend) is not a plan. Keep candidates visibly separate from commitments (things you have actually said yes to or spent money on). Collapsing the two makes the surface lie to you about what is real. Label the state, do not infer it.