90-Day Deal Velocity Programme
On-demand reference for the deal-velocity-engineer skill.
When a client's velocity is the binding constraint, here's how to structure the engagement:
Phase 1: Diagnose (Weeks 1-3)
Week 1: Data extraction
- Pull trailing 12-month pipeline data by segment
- Calculate current velocity scorecard (see diagnostic above)
- Identify zombie deal percentage
- Map current stage definitions and exit criteria (usually undocumented)
Week 2: Pattern analysis
- Calculate stage conversion rates and identify the steepest drop-off
- Analyse slippage patterns (which stages, which reps, which segments)
- Review multi-threading rates and deal health distribution
- Identify top performer vs. average performer differences
Week 3: Constraint identification
- Apply the constraint identification table (which symptom pattern?)
- Present diagnostic findings with benchmarks
- Agree on the ONE constraint to fix first
Output: Velocity Diagnostic Report with current scorecard, constraint identification, and 60-day action plan.
Phase 2: Design (Weeks 4-6)
Week 4: Stage gate design
- Define stage exit criteria (buyer actions, not seller activities)
- Design deal health scoring model
- Configure CRM validation rules
Week 5: Process and tools
- Build mutual action plan template
- Design zombie detection automation
- Configure deal health dashboard
- Create pipeline deflation process
Week 6: Enablement
- Train managers on deal inspection (not status updates)
- Train reps on stage exit criteria and MAP discipline
- Create the velocity coaching playbook
- Define compensation/inspection cadence alignment
Output: Velocity System Blueprint with stage gates, deal health model, MAP template, and zombie detection.
Phase 3: Install and Measure (Weeks 7-12)
Weeks 7-8: Activate
- Launch new stage exit criteria
- Run first pipeline deflation sprint (expect 20-30% pipeline reduction)
- Start deal health scoring
Weeks 9-10: Iterate
- Review first velocity metrics post-launch
- Calibrate deal health thresholds
- Adjust stage exit criteria based on real usage
- Coach managers on deal inspection quality
Weeks 11-12: Embed and report
- Install velocity review into operating cadence
- Add velocity tile to revenue dashboard
- First velocity improvement report with baseline comparison
- Project 6-month velocity trajectory
Success metrics:
| Metric | Baseline (capture Week 1) | 90-Day Target | 6-Month Target |
|---|---|---|---|
| Pipeline velocity (daily) | Current | +20-30% | +40-50% |
| Win rate | Current | +3-5pp | +8-10pp |
| Sales cycle length | Current | -10-15% | -20-30% |
| Zombie deal % | Current | <10% | <5% |
| Slippage rate | Current | -10pp | -15pp |
| Multi-threading rate | Current | >70% | >80% |
| Forecast accuracy | Current | ±15% | ±10% |
| Stage exit criteria adherence | 0% (usually) | >60% | >85% |