Reference file

90-Day Deal Velocity Programme

90-day-deal-velocity-programme.md

90-Day Deal Velocity Programme

On-demand reference for the deal-velocity-engineer skill.

When a client's velocity is the binding constraint, here's how to structure the engagement:

Phase 1: Diagnose (Weeks 1-3)

Week 1: Data extraction

  • Pull trailing 12-month pipeline data by segment
  • Calculate current velocity scorecard (see diagnostic above)
  • Identify zombie deal percentage
  • Map current stage definitions and exit criteria (usually undocumented)

Week 2: Pattern analysis

  • Calculate stage conversion rates and identify the steepest drop-off
  • Analyse slippage patterns (which stages, which reps, which segments)
  • Review multi-threading rates and deal health distribution
  • Identify top performer vs. average performer differences

Week 3: Constraint identification

  • Apply the constraint identification table (which symptom pattern?)
  • Present diagnostic findings with benchmarks
  • Agree on the ONE constraint to fix first

Output: Velocity Diagnostic Report with current scorecard, constraint identification, and 60-day action plan.

Phase 2: Design (Weeks 4-6)

Week 4: Stage gate design

  • Define stage exit criteria (buyer actions, not seller activities)
  • Design deal health scoring model
  • Configure CRM validation rules

Week 5: Process and tools

  • Build mutual action plan template
  • Design zombie detection automation
  • Configure deal health dashboard
  • Create pipeline deflation process

Week 6: Enablement

  • Train managers on deal inspection (not status updates)
  • Train reps on stage exit criteria and MAP discipline
  • Create the velocity coaching playbook
  • Define compensation/inspection cadence alignment

Output: Velocity System Blueprint with stage gates, deal health model, MAP template, and zombie detection.

Phase 3: Install and Measure (Weeks 7-12)

Weeks 7-8: Activate

  • Launch new stage exit criteria
  • Run first pipeline deflation sprint (expect 20-30% pipeline reduction)
  • Start deal health scoring

Weeks 9-10: Iterate

  • Review first velocity metrics post-launch
  • Calibrate deal health thresholds
  • Adjust stage exit criteria based on real usage
  • Coach managers on deal inspection quality

Weeks 11-12: Embed and report

  • Install velocity review into operating cadence
  • Add velocity tile to revenue dashboard
  • First velocity improvement report with baseline comparison
  • Project 6-month velocity trajectory

Success metrics:

Metric Baseline (capture Week 1) 90-Day Target 6-Month Target
Pipeline velocity (daily) Current +20-30% +40-50%
Win rate Current +3-5pp +8-10pp
Sales cycle length Current -10-15% -20-30%
Zombie deal % Current <10% <5%
Slippage rate Current -10pp -15pp
Multi-threading rate Current >70% >80%
Forecast accuracy Current ±15% ±10%
Stage exit criteria adherence 0% (usually) >60% >85%